In the scope of substation expansions project, Power Solutions has successfully concluded the installation of integrated automation system at eight substations of Energisa. The scope of supply included a 34.5 kV transformer bay, installation of line bays at the substation switchyard, as well as integration and adaptation of existing bays in a new system. All the works, including the commissioning, were performed and concluded by the end of 2015. |