Chilean company Chilectra continues to trust on Efacec Automation products and solutions. Recently Efacec has successfully concluded installation of automation system featuring protection and control at 110/12 kV Chicureo substation.
The solution installed at this substation is based on CLP 500SAS platform, an integrated and innovative solution that enables system operators with modern and technologically advanced management and control solution.
This new substation aims to respond to the growth of power demand revealed in north of metropolitan area of the capital Santiago. With a state-of-the-art technology applied in this substation, through local and remote control, full integration in the Chilectra’s operation centre, online monitoring and control of events on the grid is possible now, ensuring power supply with high quality service.
Efacec Automation is very satisfied with this new implementations in Chile, where Efacec is operating for over a decade, having supplied Chilectra with automation systems for more than tweny T&D substations. |